// Service · Full Web Team for Startups
Full Web Team
for Startups
Instead of hiring 5 engineers and managing them — get a full team that's already been through it.
A startup doesn't have 3 months for hiring. Doesn't have $17K/month for a CTO who hasn't decided what to build yet. And doesn't have patience for VC philosophy about "keeping engineering in-house." What it has — a timeline. A budget. And users who are waiting.
We're your development team. Not an outside vendor — a partner. We come in as a complete dev team: an experienced CTO, full-stack engineers, a designer, and DevOps. You drive the vision. We build the product.
// 01 · Who it's for
Who this is for
We work with startups at every stage — from pre-seed to post-seed, with technical and non-technical founders alike.
- 01
Pre-Seed to Seed
You have an idea. Maybe a first investor too. You need an MVP that works, fast, and professionally — so every funding round shows positive metrics.
- 02
Non-technical founders
You understand the market, the customer, the deal. You don't have a CTO, and no time to learn Kubernetes. That's us.
- 03
Technical founders without a team
You're the CTO. But you can't write all the code alone. A complete team that supports you and works to your standards.
- 04
Post-Seed startups
That need fast team reinforcement. Instead of three months of hiring, you get a ready team in a week.
- 05
Companies launching a new product
Without adding fixed headcount to the org. A team that works on the new product without interrupting the core.
// Track A · A defined MVP project
MVP development with a clear scope and a clear test goal
A first version built to answer one question with real users — not a small version of the full product. This is what gets delivered, what is included, and how you know the project is done.
What does the first version need to teach you?
Before scope comes a question: who the user is, what the problem is, and what they will do differently once the product exists. That hypothesis, one core flow and a now/later table are the input to the project. How to build them — in the guide:
How to define an MVP you can test with users — the full guide
What is delivered
- 1
An approved scope document
The hypothesis, the user, the core flow, a now/later table with reasons, the metrics and the stop condition. This is the document the proposal is based on and that you approve before we start.
- 2
A designed interface for the core flow
The core-flow screens in Figma, reviewed with you before code. Not every screen of the future product — only what is needed to complete the flow once.
- 3
A working version with real users
An app or web system in a production environment, with the measurement defined in the scope document wired in. Every sprint — a version you can open and test, not a slide deck.
- 4
A handover package
A repository in your name, cloud and store accounts in your ownership, operating documentation, and a list of what was built against the scope document — including what was deferred and why.
Scope and exclusions
An MVP project is defined by what is not in it as much as by what is. This is our default split — and it changes according to each project's scope document.
| Area | Inside the MVP project | Outside the project — separate agreement or on your side |
|---|---|---|
| Specification | Focused specification of the core flow: entities, roles, states and the exceptions that must be handled in version one | A full product roadmap, market research, a business plan |
| Design | UX and UI for the core-flow screens, at a finish level suitable for real users | Branding, a marketing website, investor materials |
| Development | Frontend, backend, basic permissions, the integrations without which the flow does not work | Nice-to-have integrations, a full admin panel, automations that serve future growth |
| Testing and release | Testing of the core flow, a production environment, store submission when the deliverable is an app | Comprehensive test automation, load testing, compliance and security beyond the baseline |
| Measurement | Wiring the metrics defined in the scope document, so the question the MVP was built for can be answered | Analysing the results and deciding what next — your decision, with the data in hand |
| After handover | Handoff and documentation | Maintenance, ongoing development and day-to-day operations — on the ongoing-team track or under a maintenance agreement |
Specification
Inside the MVP project: Focused specification of the core flow: entities, roles, states and the exceptions that must be handled in version one
Outside the project — separate agreement or on your side: A full product roadmap, market research, a business plan
Design
Inside the MVP project: UX and UI for the core-flow screens, at a finish level suitable for real users
Outside the project — separate agreement or on your side: Branding, a marketing website, investor materials
Development
Inside the MVP project: Frontend, backend, basic permissions, the integrations without which the flow does not work
Outside the project — separate agreement or on your side: Nice-to-have integrations, a full admin panel, automations that serve future growth
Testing and release
Inside the MVP project: Testing of the core flow, a production environment, store submission when the deliverable is an app
Outside the project — separate agreement or on your side: Comprehensive test automation, load testing, compliance and security beyond the baseline
Measurement
Inside the MVP project: Wiring the metrics defined in the scope document, so the question the MVP was built for can be answered
Outside the project — separate agreement or on your side: Analysing the results and deciding what next — your decision, with the data in hand
After handover
Inside the MVP project: Handoff and documentation
Outside the project — separate agreement or on your side: Maintenance, ongoing development and day-to-day operations — on the ongoing-team track or under a maintenance agreement
Acceptance conditions — how we know we are done
- 01
The core flow completes end to end
A real user, real data, in the production environment — not a developer's demo.
- 02
The metrics are being collected
Every metric defined in the scope document is actually measured and can be read without asking a developer.
- 03
Ownership is yours
Code, accounts, domain and stores in your name. No asset depends on an account of ours.
- 04
The documentation enables continuation
Operating documentation, a list of what was built against the scope and what was deferred — so another team could continue from here.
And after the first version?
The decision is made on the feedback and usage that were measured — not on a feeling that one more feature is missing, and not as a promise of funding or adoption. Three continuations are possible: the next version as another defined project; moving to an ongoing team when the pace of change justifies standing capacity; or stopping with an orderly handover. Scope and budget for the continuation depend on integrations, risk and the infrastructure required — and are set again at each stage.
- How to decide whether to continue — hypothesis, metric and stop condition
- Before the project: discovery and UX/UI design
- When the deliverable is an app: what makes up the budget
- Defined project or ongoing team? — responsibility matrix and how change is priced
- Track B — an ongoing development team after the first version
// 02 · What's in the team
What's in the team
A full team — not just developers. A CTO who leads, a designer who understands product, DevOps that handles infrastructure, and QA that tests it all. We plug in as one unit.
- 01Tech leadership
Experienced CTO / Tech Lead
One person who owns the entire technical side. Makes decisions, designs architecture, enforces quality. Turns the idea into a technical plan.
- 02Engineering
Full-Stack engineers
Working on both frontend and backend. We size the team to the need — from 1 engineer up to a team of 5+.
- 03Product & design
UI/UX designer
Not a designer who only delivers pretty screens. A designer who understands product, UX, and works alongside the engineers.
- 04Infrastructure
DevOps / Cloud Engineer
Handles infrastructure, deployment, cloud. So you never have to know what Kubernetes is.
- 05Quality
QA / testing
Tests the product. Because a bug in production is a broken experience — and a customer who won't come back.
- 06Product management
Product Manager (optional)
If you don't have someone running product, we can fill that role too. Prioritization, features, roadmap, measurement.
// 03 · Why not in-house
Why not build the team yourself?
Five reasons. Any one is enough on its own. Together — there's no debate.
- 01
Cost & time of hiring
Hiring a senior engineer takes 2-3 months. Hiring a full team — half a year. Plus another 3-6 months until they ship.
With us — one week. - 02
Salaries
A senior engineer in Israel — $11K-$17K gross/month. A team of 4? $55K+/month.
With us — half that, no benefits or management overhead. - 03
The team leaves
In an early-stage startup, turnover is high. An engineer leaving after 6 months — you go backwards.
Us — we're not going anywhere. - 04
Uneven workload
Most startups don't need 5 engineers all the time. Sometimes 2, sometimes 6.
With us — flexible. We scale up and down with you. - 05
Experience
Seven years of working alongside startups and businesses. We've seen many of the mistakes up close.
You — don't need to make them again.
// 04 · How it works
How it works in practice
- Week 101
Kickoff & discovery
Meetings with the founders. Understanding the product, the audience, the plan. An initial technical roadmap.
- Week 202
Infrastructure setup
Repository, CI/CD, environments (Dev/Staging/Prod), comms tools (Slack, Linear/Jira), process docs.
- Weeks 3-403
First sprint
We start building. Every sprint (two weeks) — a live build you can see.
- From day one04
Constant communication
Dedicated Slack channel, weekly meetings, monthly reports. You always know what's happening.
- Throughout05
Right-sizing
The team grows and shrinks with the need. You pay for what you need, no more.
What happens before week 1? You arrive with one hypothesis, one core flow and a now/later table — not a feature list. How to build that: How to define an MVP you can test with users
// Track B · An ongoing development team
An external development team to keep building the product
When there is a live product and a priority list that never ends, the question is not 'how many developers' but who is responsible for what, how priorities are set, and what happens at the start and at the end. This is the model.
When does an ongoing team fit?
- 01
A live product with users
There is something to maintain and something to improve at the same time. A defined project does not suit work that changes direction every two weeks.
- 02
A steady pace of change
User feedback, requests from business customers, regulatory changes. When the work list fills faster than projects close, you need capacity, not another quote.
- 03
Someone owns the product
A founder, product manager or CTO who decides what matters. If there is none, we can fill the role, but the business decisions stay with you.
Which roles and how much capacity?
Capacity is described as roles and allocation type — not as a vague number of developers. The actual allocation is set in the agreement according to the workload, and changes with it.
| Role | Allocation type | What it means in practice |
|---|---|---|
| Tech Lead | Standing, part-time | One point of contact. Owns architecture, code review and the two-week planning. The same person throughout the engagement |
| Full-stack engineers | Dedicated, sized to the workload | The main allocation. Grows or shrinks with the work list, with the notice period set in the agreement |
| UI/UX designer | As needed | Joins when there are new screens or an experience change; not on the team when there is no design work |
| DevOps / Cloud | Shared | Infrastructure, deployments, monitoring and backups. Shared across clients, with defined responsibility for your system |
| QA | Per sprint | Testing of what each sprint delivers, and regression on the critical flows before every deployment |
| Product management | Optional | Only if nobody fills the role on your side. Even then — the business decisions are yours |
Tech Lead
Allocation type: Standing, part-time
What it means in practice: One point of contact. Owns architecture, code review and the two-week planning. The same person throughout the engagement
Full-stack engineers
Allocation type: Dedicated, sized to the workload
What it means in practice: The main allocation. Grows or shrinks with the work list, with the notice period set in the agreement
UI/UX designer
Allocation type: As needed
What it means in practice: Joins when there are new screens or an experience change; not on the team when there is no design work
DevOps / Cloud
Allocation type: Shared
What it means in practice: Infrastructure, deployments, monitoring and backups. Shared across clients, with defined responsibility for your system
QA
Allocation type: Per sprint
What it means in practice: Testing of what each sprint delivers, and regression on the critical flows before every deployment
Product management
Allocation type: Optional
What it means in practice: Only if nobody fills the role on your side. Even then — the business decisions are yours
Who is responsible for what?
| Area | You | Us |
|---|---|---|
| Product and prioritisation | Decide what matters and why. Approve the sprint plan | Propose an order by effort and risk, flag dependencies, say when something is not worth it |
| Scope | Define the business need and the acceptance condition for each item | Break it into deliverable items, estimate, warn about overrun before it happens |
| Development | Available for questions and decisions during the sprint | Code, code review, documentation, unit tests. Code quality is our responsibility |
| QA and acceptance | Test against the acceptance conditions you defined. Approve release | Internal testing and regression before anything reaches you for acceptance |
| Production and operations | Own the accounts, the domain and the data. Decide on deployment windows | Monitoring, deployments, backups and incident handling — within the scope and service hours set in the agreement |
| Budget | Set the monthly capacity and the notice period for changing it | Report capacity use every sprint; no overrun without approval |
Product and prioritisation
You: Decide what matters and why. Approve the sprint plan
Us: Propose an order by effort and risk, flag dependencies, say when something is not worth it
Scope
You: Define the business need and the acceptance condition for each item
Us: Break it into deliverable items, estimate, warn about overrun before it happens
Development
You: Available for questions and decisions during the sprint
Us: Code, code review, documentation, unit tests. Code quality is our responsibility
QA and acceptance
You: Test against the acceptance conditions you defined. Approve release
Us: Internal testing and regression before anything reaches you for acceptance
Production and operations
You: Own the accounts, the domain and the data. Decide on deployment windows
Us: Monitoring, deployments, backups and incident handling — within the scope and service hours set in the agreement
Budget
You: Set the monthly capacity and the notice period for changing it
Us: Report capacity use every sprint; no overrun without approval
How is work planned and reported?
- 1
Two-week prioritisation
A short planning meeting: what goes into the sprint, what is deferred and why. The work list is one shared document — not message threads.
- 2
Delivery every sprint
Every sprint ends in a version you can open, with a list of what went in. Whatever did not finish is said explicitly, not hidden.
- 3
Ongoing transparency
A shared task board, a dedicated communication channel, and a periodic report: what was delivered, capacity used, open risks.
- 4
Changing direction mid-way
Possible. The cost is the work already done on what gets deferred — and we state it before the change, not after.
How does it start, and how does it end?
- 01
Onboarding
Access to code, environments and accounts; a review of the existing system and documentation; a list of known issues and risks; and the first acceptance conditions. If the product comes from a previous vendor, the full list of what to receive and check is in the takeover guide.
- 02
Offboarding
A handover package identical to what we require when we take over a product: code in your name, accounts in your ownership, operating documentation, a list of open items and risks, and a handoff to the team that continues — in-house or external. The notice period is set in the agreement.
- Moving to a new development company: what to receive, check and hand over
- Taking over an existing product for maintenance and ongoing development
When is a defined project the better choice?
When the scope is known, there is a single target date and there is no live product to maintain yet, a defined project with written acceptance conditions gives both sides more certainty. The first version of a new product is almost always such a project; the MVP track above describes it.
// 05 · Beyond the code
What you get beyond the code
We don't just write lines. We're partners — with perspective, network, and judgment.
- 01
Strategic advice
Which stack? Which cloud? How to price? We've seen it all.
- 02
Funding-round readiness
Code that passes due diligence. Architecture that convinces investors. Reports that show what was built.
- 03
Network
Designers, advisors, lawyers, accountants. We know good people, and we're happy to connect.
- 04
Perspective
You're under pressure. We stop, check, give perspective. Like a real team.
// 06 · Technology
Our stack
A full stack — frontend, backend, mobile, cloud, database, auth, payments, and AI. All modern — not because it's trendy, but because it ships faster and scales better.
- Frontend
- React
- Next.js
- Vue
- Remix
- Backend
- Node.js
- Python
- Go
- Mobile
- React Native
- Flutter
- Native
- Cloud
- AWS
- GCP
- Vercel
- Database
- PostgreSQL
- MongoDB
- Redis
- Auth
- Auth0
- Clerk
- Supabase
- Payments
- Stripe
- PayPlus
- AI
- OpenAI
- Claude
- MCP Servers
// 07 · Why us
Why us
- 01
We've been in your seat
The founders of this company built it from zero. We know how a startup feels.
- 02
We treat your product like ours
Every decision — like our money is on the line. Not "whoever pays decides," but "what's the right thing to build."
- 03
Fast and rigorous
We move fast — because you're under pressure. But we don't cut corners. The code holds.
- 04
We don't disappear
After the MVP, after launch, after the round — we're still here. Growing with you.
- 05
Production responsibility — defined up front
Monitoring, deployments and incident handling are part of the team's job. Scope, service hours and how incidents are handled are set in the agreement — not in a promise.
// From our work
Products our team has accompanied over time
Two products where onezero worked as the client's development team over years, not as a project with an end date — with what we built in each, as the case study describes it.
AI platform · APIs · Voice
OneAI
A five-year technology partnership: a language-AI and API platform, chat agents and a voice-AI system — through to the 2026 acquisition by monday.com.
Read the OneAI case studyReact Native · Web · Backoffice
Dividandy
A fintech gaming platform: competitive trading tournaments with virtual capital, a simulated engine on live market data, live leaderboard, wallet and KYC.
Read the Dividandy case study
// 08 · FAQ
Frequently asked questions
01.How much does a full team cost?
It depends on scope. Practical minimum — $7K-$10K/month (equivalent to 2-3 developers). Mid-sized team — $11K-$22K/month. Full team with a CTO — $22K-$55K/month. All-in, no surprises.
02.Isn't that expensive?
Think about the true cost of building in-house: salaries + benefits + office + equipment + manager + onboarding period. We're about half. Without the risk of a bad hire.
03.What's the difference between you and freelancers?
A freelancer is one person. We're a full team. A freelancer leaves after 3 months. We don't. A freelancer doesn't do architecture, DevOps, and design together. We do — all in-house.
04.What's the difference between you and a typical dev shop?
A typical dev shop takes a project, delivers, and leaves. We're a team. We stay. We grow with you. New feature or small bug — the same person handles it.
05.Do you work remotely or from an office?
Default — remote (Zoom, Slack). If you want in-person meetings — at our office or yours, as needed.
06.We'd like an in-house CTO eventually. Will you get in the way?
The opposite. We help you hire them, run a structured handoff, and then scale our involvement down — or stay on as on-demand support.
07.Do you build mobile apps too?
Yes. Same team, web and mobile, in sync.
08.What about IP? Our code?
Yours. All of it. The code, the repository, the accounts, the GitHub. We help from the outside.
09.How long is the commitment?
Minimum 3 months at the start — so there's a real outcome. After that — month-to-month. You can pause, stop, scale up. Flexible.
10.We're pre-seed. We can't afford all this.
We have pre-seed tracks — a fixed-price MVP package or a small team of 1-2 developers. Let's talk and figure it out.
11.Do you invest in equity?
Not usually. But for special projects, we can discuss a hybrid model — part cash, part equity.
12.What about NDAs and confidentiality?
Standard. We sign an NDA upfront on every project. Your idea stays yours.
13.We were referred by someone. Is there a discount?
Depends — let's talk. We appreciate referrals.
14.We're just two co-founders. Who do we actually talk to?
To the CTO/Tech Lead leading your team. One point of contact. They keep you updated on all the technical details, clearly.
15.What if we want to hand off the work to our in-house team?
Happy to. We document, explain, and support the handoff. So your in-house team has a solid base to continue from.
16.What is the difference between a defined MVP project and an ongoing team with you?
An MVP project is a defined deliverable: a scope document with a hypothesis, a core flow and a now/later table, a working version handed over to you with code, access and documentation — and acceptance conditions written in advance. An ongoing team is capacity: roles and allocation set in the agreement, two-week prioritisation, and continuous responsibility for development, QA and production. You can start with a project and move to a team — or the other way round — and each track has its own section on this page.
17.What do you get when the team engagement ends?
A handover package: the repository in your name, cloud accounts, domain and store accounts in your ownership, operating and configuration documentation, a list of open tasks and known risks, and an orderly handoff to the team that continues — in-house or external. It is the same standard we require when we take over a product from a previous vendor.
Last reviewed:
Related reading
Case study
Case study: OneAI — five years of AI, acquired by monday.com
A long-term technology partnership: from a language AI and API platform, through chat agents, to a voice AI system — and the 2026 acquisition by monday.com.
Guide
How much does app development cost in Israel in 2026?
A real cost breakdown: MVP, Backend, Realtime, AI, DevOps and maintenance. Realistic ranges, no clickbait numbers, with hidden costs people discover too late.
Comparison
Israeli software house vs offshore — true cost and trade-offs
Honest breakdown: hourly rate, quality, communication gaps, security and regulation. When offshore makes sense — and when it ends up costing more.
Case study
Case study: Tory — on-demand mobile services
We built a client app, a driver app, and a real-time dispatch backend from scratch. Architecture, matching engine, and an order flow measured in seconds.
// 09 · Let's talk
Got a startup idea?
A 30-minute intro call. No strings attached. We'll tell you if we're a fit, what team size to start with, and how long it'll take.
Straight. To the point. On time.